Public Input Sought on Proposed Bridge Replacement on Iowa 16 Over Sugar Creek

The Iowa Department of Transportation is asking for public feedback on a proposed bridge replacement project along Iowa 16 over Sugar Creek in Lee County. The project, scheduled to begin in the spring of 2028, aims to enhance safety and infrastructure in the area.

The plan includes removing and replacing the existing bridge structure, installing new guardrails, constructing slope protection beneath the bridge, and adding edge drains to improve drainage and stability. Construction is expected to be completed by the fall of 2028.

During the construction period, Iowa 16 will be closed to through traffic. A detour is being proposed that would reroute vehicles along U.S. 218/Iowa 27, County Road J40, and County Road W55. The detour is intended to maintain safe travel while allowing work crews full access to the project area.

Community members and stakeholders are encouraged to share their thoughts on the project, including concerns about the detour, environmental impacts, or access during construction.

To submit feedback or learn more about the proposed bridge replacement, visit the Iowa DOT website or contact the Office of Location and Environment.

Your input will help shape final decisions and ensure that local needs are considered as planning continues for this important infrastructure update.